projects we have been assigned to
- 2015
- 2014
- 2013
- 2012
- 2011
- 2010
- 2009
- 2008
- 2007
- 2004
- 2003
- 132kV Transmission line to Luzira substation in Luzira Industrial Park
- 132kV Transmission line to Iganga substation in Iganga Industrial Park
- 132kV Transmission line to Mukono substation in Mukono industrial park
- Luzira 3X32/40 MVA, 132/33kV Substation
- Iganga 2X32/40 MVA, 132/33kV Substation
- Mukono 3X50/63 MVA, 132/33kV Substation
- Environmental and Social Impact Assessment, Resettlement Action Plan (RAP) studies And Resettlement Action Plan Implementation for the proposed Industrial Parks, 132kV Transmission Lines and The Associated 132/33kV Substations. Lot 2 _Mukono and Iganga Industrial Parks 132kV transmission lines and substations
- Environmental and Social Impact Assessment, Resettlement Action Plan (RAP) studies And Resettlement Action Plan Implementation for the proposed Industrial Parks, 132kV Transmission Lines and The Associated 132/33kV Substations. Lot 1 _Luzira Industrial Park 132kV transmission line and substation
- 132kV Transmission line to Namanve South substation in Namanve South Industrial Park
- Namanve South 3X50/63 MVA, 132/33kV Substation
- Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies for the Hoima to Kafu 220kV Transmission line and associated substations
- Feasibility Study, Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, detailed engineering design, preparation of tender documents and supervision of works for the Namanve Industrial park 132kV Transmission line and associated substations
- Thai An 2X41MW Hydro power plant (subcontractor offering engineering services for switch yard to EPC Contractor _ Messrs People Ele. Appliance Group Co., Ltd)
- Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, for the Tororo to Lira 132kV Transmission line (260 Kilometres) and associated substations
- Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, RAP Implementation for the Mbarara to Nkenda 132kV Transmission line (160 Kilometres) and associated substations
- Feasibility Study, Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, detailed engineering design, preparation of tender documents and Project Management plus construction supervision for the proposed Bushenyi to Buhweju 33kV sub Transmission Line including substations and low voltage network.
- Feasibility Study, Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, detailed engineering design, preparation of tender documents an dProject Management plus construction supervision for the proposed Kibaale – Kagadi - Muhororo 33kV sub Transmission Line including substations and low voltage network.
- Feasibility Study, Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, detailed engineering design, preparation of tender documents andProject Management plus construction supervision for the proposed Kamuli to Bukungu Landing site 33kV sub Transmission Line including substations and low voltage network.
- Feasibility Study, Environmental Social-Economic Impact Assessment (ESIA) and Resettlement Action Plan (RAP) studies, detailed engineering design, preparation of tender documents andProject Management plus construction supervision for the proposed generation of electricity from sugar cane waste (co-generation) at Kakira sugar works including 33kV sub Transmission Line to Mailombili substation in Jinja.
- Environmental Impact Assessment of proposed Mini hydro power plant at Nyamabuye
